
Phones answered 7am to 5pm
Drain replacement in Woden: separate private and shared approval Drain replacement & excavation.
We dig out the bad pipe, lay new pipe and put the ground back.
- Call back in 5 minutes
- Same day visits
- 10% off when you book online
- Rated 5.0 on Google
- Licensed in the ACT and NSW
- Homes, rentals and businesses
★★★★★
“Friendly … and respectful of making a worksite in your home”Sue M · Google review★★★★★
“Arrived on time … and left everything clean and tidy”Talia · Google review★★★★★
“Arrived when they said they would”Alessia · Google review★★★★★
“Quick to respond, efficient … reasonably priced”Christine · Google review
Still putting up with these?
The drain gets cleared, then blocks again weeks later.
We replace the pipe that keeps causing it.
The pipe has collapsed and nothing flows past.
We dig it out and lay new pipe.
A long stretch of old pipe is cracked all the way.
We replace the whole failing run, not just a patch.
Drain replacement & excavation in Woden Valley
Woden drain replacement enquiries: identify the approving party, distinguish investigation consent from pipe work and clarify common-area restoration.
Shared Woden buildings and the sewer boundary
At the 2021 Census, 21.3% of Woden Valley’s occupied private dwellings were flats or apartments, 20.3% were semi-detached homes or townhouses and 30.8% were rented. In shared buildings, the approval question starts with where the pipe sits. Icon Water places the border between its network and a property’s sanitary system usually at the property boundary, typically downstream of the last inspection opening, and where there is no inspection opening the approved drainage plan sets it. Pipe upstream of that border is the property owner’s to maintain, so approval for replacing it comes from the owner’s side.
Checking a drainer’s licence for Woden work
In the ACT, drainers need a licence under the Construction Occupations (Licensing) Act 2004, as do plumbers and gasfitters. Access Canberra keeps public registers showing a drainer or plumber’s licence status, including expired, suspended or cancelled licences, so an owner, tenant or committee member can look the licence up before agreeing to access. Beyond the boundary, the ACT Government’s Woden District Strategy notes that Icon Water has known key sewer capacity constraints in Woden, subject to planned major upgrades.
Here's how it works.

Give us a call.
Call or send the form. Tell us how often the drain fails and where it gives you trouble.
Step 1: Give us a call.
When this service is useful
Replacement becomes relevant when damaged pipework cannot be addressed sensibly by clearing or a limited repair. Oroflow undertakes drain excavation and replacement. The first decision is the extent of renewal: a known damaged section and a larger failing run are different scopes.
Agree what the quote covers
Ask about pipe supply, excavation, removal, connections, checking the work and surface reinstatement. Identify responsibilities for concrete or landscaping. A clear scope matters more than an unexplained total, especially when access or the retained pipe condition is uncertain.

We come to you.
We find where the pipe runs and plan a safe dig with you.
Step 2: We come to you.
Plan the dig-up
Discuss pipe location, safe access, underground services and how open work areas will be protected. Paving, gardens and vehicle access may be affected. Do not start digging yourself; buried services require proper planning and coordination.
Before the dig: plans and markups
Every drain replacement starts with knowing what else is in the ground. A Before You Dig Australia enquiry is free, and one request notifies the registered asset owners at the work site, so there is no need to contact each utility separately. BYDA members are encouraged to respond within 2 business days, and they send plans straight to whoever lodged the enquiry. Those plans carry an expiry date set by each asset owner. If a job is delayed past it, a new enquiry is needed. In the ACT, property owners can also ask Icon Water to physically mark its assets on the property after the enquiry. For some assets, that markup is mandatory before work can begin.

We replace it.
We lay the new pipe, get it checked and close the trench.
Step 3: We replace it.
Inspections and paperwork for NSW drain replacement
In Bungendore and Braidwood, Queanbeyan-Palerang Regional Council is the local plumbing regulator. The drainer must submit a Notice of Work to council before digging starts. Inspections are usually booked at set points: after drainage work is finished but before it is backfilled, after connecting to the sewer main but before backfilling, and when everything is finished before occupation. That means open trenches may need to stay open until the inspector has been. At the end, you should receive a Certificate of Compliance naming the responsible plumber or drainer. You should also get a copy of the Sewer Service Diagram showing where the new private pipes run.

Easy payment.
We tell you how to pay before we start, so there's no awkward moment at the end.
Old pipe out. New pipe in.

One damaged section
A single bad length dug out and renewed.
- Collapsed pipe sections
- Cracked lengths
- New joins to the old pipe
- Short digs in lawn or garden

A whole drain run
A longer failing drain, renewed end to end.
- Old drains that keep failing
- Sewer runs to the boundary
- Stormwater runs to the tie
- New pipe checked before backfill

Digging and making good
The dig, then the ground put back as agreed.
- Digs under lawns and gardens
- Digs near paving and paths
- Old pipe taken away
- Surfaces put back as agreed
Other services
Common questions
Straight answers to what people ask us most.
Can't see your question? Call 0403 095 102
Why were Woden’s public drains redesigned after 1971?
A flash flood at Yarra Glen on Australia Day 1971 killed seven people, and drains and roads in the area were later redesigned. Residents still value the Woden Flood Memorial, which commemorates the lives lost.
What part does Yarralumla Creek play in Woden’s drainage?
The ACT Government describes Yarralumla Creek, the major watercourse through Woden, as a floodway that carries significant flows during heavy rain. ACT Healthy Waterways projects included wetland ponds in Mawson and Curtin to improve the stormwater it drains.
Do I need a Before You Dig enquiry to replace a drain?
Before You Dig Australia says anyone who intends to work around underground infrastructure, including plumbers and homeowners, should lodge a free enquiry before starting. Receiving every response is not approval to excavate. Each asset owner’s directions still have to be followed.
Will a replaced drain be inspected in Canberra?
Yes. ACT plumbers and drainers must notify Access Canberra before starting work, when work is ready for inspection and when it is completed. Once a drainage system is fully in place, all drains are inspected. Other plumbing work in the ACT is checked through targeted audits instead.
Should I avoid planting trees over a new sewer line in Canberra?
Icon Water recommends avoiding trees or shrubs with invasive roots near wastewater assets. It applies the canopy principle: what grows above ground reflects the growth below ground. Tree and shrub roots getting into pipes are one of the common blockage causes Icon Water lists.
Do I have to replace the whole drain?
Not always. One damaged section and a longer failing run are different jobs. We work out which one you have first.
Do you check for other pipes and cables before digging?
Yes. Every drain replacement starts with a free Before You Dig enquiry, which tells the owners of buried services at your place. In the ACT, you can also ask Icon Water to mark its pipes on site.
Will my driveway or garden be affected?
It can be. Before we dig, we talk through paving, gardens and car access, and who puts each one back.
Do I have to replace the whole drain?
Not always. One damaged section and a longer failing run are different jobs. We work out which one you have first.
Do you check for other pipes and cables before digging?
Yes. Every drain replacement starts with a free Before You Dig enquiry, which tells the owners of buried services at your place. In the ACT, you can also ask Icon Water to mark its pipes on site.
Will my driveway or garden be affected?
It can be. Before we dig, we talk through paving, gardens and car access, and who puts each one back.
What paperwork do I get at the end?
In Bungendore and Braidwood, you get a Certificate of Compliance and a copy of the Sewer Service Diagram showing where the new pipes run.
Do you come out to Bungendore and Braidwood?
Yes. We cover Canberra and about 100 km around it.
Are you licensed?
Yes. ACT 20241513 and NSW 498011C, and fully insured.
Tell us what's wrong. We'll take it from there.
Send us a few details and we'll take it from there.
- Call us0403 095 102
- Email usoffice@oroflowplumbing.com





