
Phones answered 7am to 5pm
Building over old drains? Underground drainage & pipework.
We plan the pipe route, then lay the drains before the floors and paving go in.
- Call back in 5 minutes
- Same day visits
- 10% off when you book online
- Rated 5.0 on Google
- Licensed in the ACT and NSW
- Homes, rentals and businesses
★★★★★
“Friendly … and respectful of making a worksite in your home”Sue M · Google review★★★★★
“Arrived on time … and left everything clean and tidy”Talia · Google review★★★★★
“Arrived when they said they would”Alessia · Google review★★★★★
“Quick to respond, efficient … reasonably priced”Christine · Google review
Still putting up with these?
You're adding a bathroom and the drains need to move.
We plan the new pipe route before work starts.
New paving goes down soon and the drains aren't done.
We get the drains in first, so nothing is dug up later.
Nobody knows where the old pipes actually run.
We check the real route on site, not just an old plan.
Here's how it works.

Give us a call.
Call or send the form. Tell us what you're building and send the plans if you have them.
Step 1: Give us a call.
When this service is useful
Underground drainage connects the visible fixtures and collection points to the wider system. Installation or alteration needs assessment of the actual route, connections and site access. A proposed layout is not a substitute for checking existing pipework.

We come to you.
We walk the site, check what's in the ground and plan the route.
Step 2: We come to you.
Before excavation
Identify affected work areas, access restrictions and other buried services. Discuss who will coordinate permissions and other trades. Do not excavate simply because an old plan appears to show a clear route; current site conditions matter.
Easements and buried services in Queanbeyan-Palerang
Around Bungendore and Braidwood, the route a new pipe can take is often shaped by easements. Queanbeyan-Palerang Regional Council requires interallotment drainage for every lot that does not drain directly to its street or a natural watercourse. That drainage sits within an easement at least 2.5 m wide. Council policy says no construction of any type is permitted within an easement for water, sewer or stormwater works unless the policy specifically allows it. That includes an implied easement at least 3.0 m wide over existing mains. Before You Dig plans help, but they show only the approximate location of assets. A skilled locator may be needed to pinpoint them.

We lay the pipes.
We lay and check the drains before the trenches close and the surfaces go down.
Step 3: We lay the pipes.
Project sequencing
Resolve drainage routes and testing before closing trenches or installing final surfaces. Ask how existing connections will be retained or changed and which reinstatement tasks are included. Early coordination reduces the risk of reopening newly completed work.
What a Canberra drainage plan has to show
New underground drainage in the ACT is drawn before it is dug. Certified plumbing and drainage plans must show the points of connection to the sewer, water main and stormwater system. They also show the overflow gully position and the location and depths of sewer, water and stormwater connections. Some layouts go to Icon Water as the referral authority. That applies to plans that change or remove a sewer connection point, increase sewer load, discharge surface or stormwater to the sewer, or involve sewage pumping. During the job, the drainer notifies Access Canberra at the start, when work is ready for inspection, and at completion. Every drain is inspected once the system is fully in place.

Easy payment.
We tell you how to pay before we start, so there's no awkward moment at the end.
New drains for new rooms and yards.

New drains
Drain pipes for new homes and extensions.
- New sewer pipes
- New stormwater pipes
- Drains for extensions
- Connections at the boundary

Moved drains
Changed pipes when rooms move in a renovation.
- Moved toilets and showers
- New kitchen positions
- Old pipes joined to new
- Old connections kept or changed

Drains under paving
Pipes laid and checked before surfaces go down.
- Under new driveways
- Under paths and patios
- Under landscaped gardens
- Under concrete slabs
Local plumbing help across Canberra and the region
Canberra, Bungendore, Braidwood and surrounding areas. Not sure? Call 0403 095 102.
Map data © OpenStreetMap contributors
Type your suburb and we'll tell you straight away.
Other services
Common questions
Straight answers to what people ask us most.
Can't see your question? Call 0403 095 102
Do you need drainage plans before you start?
In the ACT, new underground drainage is drawn up in certified plans before it's dug. The plans show where the pipes connect and how deep they sit.
Is the new drain inspected?
Yes. In the ACT, the drainer tells Access Canberra when work starts, when it's ready to inspect and when it's done. Every drain is inspected once it's all in.
Can you work with my builder?
Yes. We talk through who handles permissions and other trades, so the drains go in before the final surfaces.
Can a pipe go anywhere on my block?
Not always. Around Bungendore and Braidwood, easements limit where pipes and buildings can go. We plan the route around them.
Do you come out to Bungendore and Braidwood?
Yes. We cover Canberra and about 100 km around it.
Are you licensed?
Yes. ACT 20241513 and NSW 498011C, and fully insured.
Tell us what's wrong. We'll take it from there.
Send us a few details and we'll take it from there.
- Call us0403 095 102
- Email usoffice@oroflowplumbing.com





